>
-Treehouse #2
Treehouse #2: Construction
created: May 4, 2010
last updated: May 4, 2010

Level 1:
A platform half-way between the ground and level 2


Level 2:
The highest level.


Brackets:
The assortment of brackets made for the treehouse


>
Treehouse #2 - Finsished Images

Entire treehouse from the side Close-up of finished level 2


Ladder connecting ground the level 1 The hatch door in the floor of level 2


Completed hatch door Level 1 built around branch Inside ceiling of level 2